Our Projects

Filter by Project Types

Mission Critical | Data Centers

In 2020, Silverback built our own ready-mix plant after removing 1,200 CY of substandard concrete on a Virginia data center. We created the patent-pending Silverback Game Changer 3500 thermal mix (RHO low 30s), far exceeding Microsoft’s <55 spec for superior performance.

Dominion District Office

Silverback completed a 38,000 SF foundation package for Dominion Energy in South Boston, VA with Barton Malow Builders. We delivered 900 cubic yards of continuous and spread footings, concrete piers, slab-on-grade, and slab on metal deck — providing a rock-solid base for this critical energy infrastructure project, completed in 2025.

SCA First Coast Orthopedic Center- OR #4

Silverback completed the full structural and site concrete package for SCA First Coast Orthopedic Center in Jacksonville, Florida. Working with Robins & Morton, we delivered 7,193 SF of concrete work in 2025 — including in-house pumping and termite treatment for a seamless, high-quality result.

Turkey Creek Cart Paths

Out with the old, in with the smooth. 40,000 SF of cart paths demoed, hauled off, prepped, and poured at Turkey Creek Golf Course. Demo to finish, done right and ready for your next tee time.

UF Health | FRC

Silverback provided structural and site concrete for the new patient recovery apartments at UF Health’s Florida Recovery Center in Gainesville. Working with Parrish McCall, we delivered slabs, retaining walls, sidewalks, and stairways — with broom-finished exterior surfaces and smooth interior finishes. Helping create a strong, secure foundation for healing and recovery.

The Rock Church

Silverback supported The Rock Church expansion in Gainesville with two new buildings: a 4,710 SF Admin Building and a 1,702 SF Storage Building. We provided our own concrete, pumps, termite treatment, reinforcement, and full manpower to complete the structural concrete, site concrete, and masonry work.