The Rock Church did an expansion with two buildings. 4,710 SF Admin Building and 1,702 SF Storage Building. We supplied our own concrete, pumps, termite treatment, reinforcement, and manpower to perform the structural concrete , site concrete and masonry work.
Proverbs 27:17: “As iron sharpens iron, so one person sharpens another”
The Rock Church
- Owner : The Rock Church
- Location : Gainesville, FL
- Completed : 2025-07-01
- Size : 250 CY 6,000 SF
- Contractor : Foresight Construction Group, Inc.
- Scope : Continuous Footing, CMU Stem Wall, Slab on Grade, Sidewalks
RELATED PROJECTS
Silverback is proud to support the University of Florida as a trusted concrete partner. For the new College of Design, Construction and Planning, we delivered footings and cast-in-place walls with a standout feature: a true 1×8 board finish on the exterior walls. This authentic, organic texture delivers both striking beauty and lasting strength.
- Size : 1,650 CY 47,000 SF
Silverback delivered 3,000 cubic yards of footers for a new 170-acre regional school in southern Virginia — all in just five weeks. Operating three excavators twelve hours a day, we poured 200 cubic yards every afternoon while consistently placing concrete within 24 hours of opening the footers, exceeding 700 cubic yards per week.
- Size : 9,000+ CY
This project is especially meaningful to us — Silverback has called this church home for 27 years. After pouring the original foundation years ago, we’re honored to build the new addition. We went beyond the plans with wider, deeper footings and extra reinforcement to create a strong, lasting foundation built on faith for generations to come.
- Size : 1,150 CY 48,000 SF