Who says fishing and work don’t mix? Every day during their lunch break, our team took advantage of the excellent fishing near this waterfront home in Bradenton, Florida. One of the biggest challenges we faced was that local ready-mix concrete companies were booked solid for 2–3 months. So we improvised, brought our own mobile batch plant and poured 580+ cubic yards.
It was a pleasure working with GM2, and we’re looking forward to future projects with their team.
Gupta Residence
- Owner : Gupta Family
- Location : Bradenton, Florida
- Completed : 2023-10-01
- Size : 4,900 SF, 580 CY
- Contractor : GM2 General Contractors
- Scope : Grade Beams, Isolated FTGs, 6' Stem Walls, Slab on Grade, CIP Stairs, Slab on Deck
RELATED PROJECTS
Silverback is proud to support the University of Florida as a trusted concrete partner. For the new College of Design, Construction and Planning, we delivered footings and cast-in-place walls with a standout feature: a true 1×8 board finish on the exterior walls. This authentic, organic texture delivers both striking beauty and lasting strength.
- Size : 1,650 CY 47,000 SF
Silverback delivered 3,000 cubic yards of footers for a new 170-acre regional school in southern Virginia — all in just five weeks. Operating three excavators twelve hours a day, we poured 200 cubic yards every afternoon while consistently placing concrete within 24 hours of opening the footers, exceeding 700 cubic yards per week.
- Size : 9,000+ CY
This project is especially meaningful to us — Silverback has called this church home for 27 years. After pouring the original foundation years ago, we’re honored to build the new addition. We went beyond the plans with wider, deeper footings and extra reinforcement to create a strong, lasting foundation built on faith for generations to come.
- Size : 1,150 CY 48,000 SF


