UF DCP Collaboratory Project
Silverback is proud to support the University of Florida as a trusted concrete partner. For the new College of Design, Construction and Planning, we delivered footings and cast-in-place walls with a standout feature: a true 1×8 board finish on the exterior walls. This authentic, organic texture delivers both striking beauty and lasting strength.
- Owner : University of Florida
- Location : Gainesville, FL
- Completed : 2025-11-06
- Size : 1,650 CY 47,000 SF
- Contractor : Stellar Construction
- Scope : Continuous + Spread Footings, Cast in Place Walls, Slab on Grade, Slab on Metal Deck
Mecklenburg Middle & High School
Silverback delivered 3,000 cubic yards of footers for a new 170-acre regional school in southern Virginia — all in just five weeks. Operating three excavators twelve hours a day, we poured 200 cubic yards every afternoon while consistently placing concrete within 24 hours of opening the footers, exceeding 700 cubic yards per week.
- Owner : Mecklenburg County
- Location : Baskerville, VA
- Size : 9,000+ CY
- Contractor : Cleveland Construction
- Scope : Footers, Slab on Grade, Slab on Decks
Christ Community Church
This project is especially meaningful to us — Silverback has called this church home for 27 years. After pouring the original foundation years ago, we’re honored to build the new addition. We went beyond the plans with wider, deeper footings and extra reinforcement to create a strong, lasting foundation built on faith for generations to come.
- Owner : Christ Community Church
- Location : Gainesville, FL
- Completed : 2025-01-01
- Size : 1,150 CY 48,000 SF
- Contractor : Phil Bland
- Scope : Continuous Footings, Slab on Grade, Tilt-Wall Panels, CIP Stairs
FS25
Silverback is proud to partner with Blackwater Construction Services on Fire Station 25 in Putnam County. We’re handling the full structural concrete scope — prepping, placing, and finishing the spread footings that form the foundation for this vital new station. This project will deliver faster emergency response and a safer community for years to come.
- Owner : West Putnam Fire Station
- Location : Putnam County
- Completed : 2025-04-05
- Size : 200 CY 7,000 SF
- Contractor : Blackwater Construction Services
- Scope : Isolated Footings, Slab on Grade
Celebration Pointe
Silverback delivered 3,000 cubic yards of footers and slab-on-grade concrete for Celebration Pointe in Gainesville, FL. Completed in 2019 with Viking Construction, this project provided a strong, reliable foundation for the development.
- Owner : Celebration Pointe
- Location : Gainesville, FL
- Completed : 2019-04-01
- Size : 3,000 CY
- Contractor : Viking Construction
- Scope : Footers, Slab on Grade
The Rock Church
In Gainesville’s loose soil, conventional forming methods wouldn’t hold the footers in place. Silverback solved this by implementing a Stayform System, keeping the forms steady and secure throughout placement for Celebration Pointe.
- Owner : The Rock Church
- Location : Gainesville, FL
- Completed : 2020-09-06
- Size : 2,000 CY
- Contractor : Foresight Construction
- Scope : Footers (Stayform System), Slab on Grade
Gulf Coast Home
Silverback delivered a hurricane-resistant foundation for a 4,000 sq ft custom home in Palm Harbor, FL. We poured 85 cubic yards of grade beams, 34 cast-in-place columns (16″ x 12′ tall), and tie beams — totaling nearly 200 cubic yards of concrete. This robust, high-rise style system ensures exceptional strength against Gulf Coast storms.
- Owner : Private Homeowner
- Location : Palm Harbor, Florida
- Completed : 2021-11-01
- Size : 200 CY
- Contractor : KL Custom Homes
- Scope : Slab on Grade, Grade Beams, Cast-in-Place Columns & Tie Beams
Alta Equipment Company
Silverback built a robust 30,000-square-foot facility for Alta Equipment in Midway, Florida. We delivered an 8″ slab-on-grade, isolated footings, and grade beams — pouring 1,100 cubic yards of concrete ahead of schedule. What the client expected in five weeks, we completed in just half the time.
- Owner : Alta Equipment Company
- Location : Midway, Florida
- Completed : 2023-10-01
- Size : 30,000 SF / 1,100 CY
- Contractor : Whiting-Turner
- Scope : Grade Beams, Isolated Footings, Slab-on-Grade
Gupta Residence
Silverback poured 580+ cubic yards of concrete for a waterfront home in Bradenton, Florida. Facing 2–3 month backlogs with local suppliers, we brought our own mobile batch plant to keep the project on schedule. Bonus: our crew enjoyed daily lunch-break fishing right on site while working with the great team at GM2.
- Owner : Gupta Family
- Location : Bradenton, Florida
- Completed : 2023-10-01
- Size : 4,900 SF, 580 CY
- Contractor : GM2 General Contractors
- Scope : Grade Beams, Isolated FTGs, 6' Stem Walls, Slab on Grade, CIP Stairs, Slab on Deck
A1, B1 & B2 Apartments
Silverback has partnered with Viking Construction on numerous projects across the South. At Celebration Pointe in Gainesville, we served as turnkey concrete subcontractor for three apartment buildings — building eight four-story CMU stair towers and one four-story CMU elevator. We poured cellular concrete into the blocks for maximum strength and provided our own concrete, pumps, and termite treatment for complete quality assurance.
- Owner : City Place Apartments
- Location : Gainesville, Florida
- Completed : 2024-03-01
- Size : 93,000 SF, 3,250 CY
- Contractor : Viking Construction
- Scope : Post-Tension SOG, Grade Beams, Elevator Foundation, Spread Footings, Stairwell Foundation